27/11/13
Today was the first production meeting our group had, we decided on what job roles each one of us were going to undertake. I decided to undertake the job of Sound Recordist, a Sound Recordist records all sound both on set and on location. Shemar will take the role as director which means he will make sure that we are all in the right places at the right time. Jordan was the Vision Mixer, the Vision Mixer basically edits the recording live as it is happening. To prepare for the role i researched what a Sound Recordist does.
11/12/13
Today we decided to go to location and do pre-production, we did risk assesments and a location recce. We then drew camera plans to decide what camera was going where. We decided that there were a few hazards that we had to address on the risk assessment such as trailing wires and falling down the staircase.
16/12/13
Today is the day of dress rehearsals so were going to go down to the theatre and look at how the actors cover the sides where the cameras are planning to go.
18/12/13
Today is the day that we go and film the show. Me, Shemar, Dale & Jordan will go to set an hour early to get everything set up in time for the doors opening, I will be taking on the right hand camera for the first act then switching to the middle camera for the second act.
13/1/14
Today we captured 3 of the 4 tapes we had, Jordan had the other tape at his house so we had to wait to capture the other tape.
14/1/14
Jordan brought in the last tape so we captured that then we started to edit the live event. Dale set the project up and did the 1st half of act 1, I then did the 2nd half of act 1, Jordan did the 1st half of act 2 & Shemar did the 2nd half of act 2. Looking back over the footage I am happy with what we shot, also with me taking the role of Sound Recordist i was listening out for what the sound levels were like and I am also really happy with that too, overall the production was successful.
15/12/14
Today is the hand in date, the production has been edited and just needs exporting to disc.
11/12/13
Today we decided to go to location and do pre-production, we did risk assesments and a location recce. We then drew camera plans to decide what camera was going where. We decided that there were a few hazards that we had to address on the risk assessment such as trailing wires and falling down the staircase.
16/12/13
Today is the day of dress rehearsals so were going to go down to the theatre and look at how the actors cover the sides where the cameras are planning to go.
18/12/13
Today is the day that we go and film the show. Me, Shemar, Dale & Jordan will go to set an hour early to get everything set up in time for the doors opening, I will be taking on the right hand camera for the first act then switching to the middle camera for the second act.
13/1/14
Today we captured 3 of the 4 tapes we had, Jordan had the other tape at his house so we had to wait to capture the other tape.
14/1/14
Jordan brought in the last tape so we captured that then we started to edit the live event. Dale set the project up and did the 1st half of act 1, I then did the 2nd half of act 1, Jordan did the 1st half of act 2 & Shemar did the 2nd half of act 2. Looking back over the footage I am happy with what we shot, also with me taking the role of Sound Recordist i was listening out for what the sound levels were like and I am also really happy with that too, overall the production was successful.
15/12/14
Today is the hand in date, the production has been edited and just needs exporting to disc.